From July 8-10, 2025, a contractor is scheduled to repair stormwater pipes beneath Wright Parkway between Hollywood Boulevard and the entrance to the Fort Walton Beach High School football stadium, as shown in this map.
From July 8-10, 2025, a contractor is scheduled to repair stormwater pipes beneath Wright Parkway between Hollywood Boulevard and the entrance to the Fort Walton Beach High School football stadium, as shown in this map.
Home » News » National News » Florida » Traffic note: July 8-10 work on Wright Parkway between Hollywood and football stadium
Florida

Traffic note: July 8-10 work on Wright Parkway between Hollywood and football stadium

Motorists are asked to be especially cautious July 8-10 as crews repair stormwater infrastructure beneath Wright Parkway between Hollywood Boulevard and the Fort Walton High School football stadium entrance.

Video Thumbnail

“Motorists will see temporary traffic control devices, possibly flaggers, and experience limited lane closures (middle turn lane) during construction,” according to a news release from the city of Fort Walton Beach. “Current plans do not require a full road closure and both northbound and southbound lanes will be accessible during construction.”

This article originally appeared on Northwest Florida Daily News: Traffic note: July 8-10 work on Wright Parkway between Hollywood and football stadium

Reporting by Northwest Florida Daily News / Northwest Florida Daily News

USA TODAY Network via Reuters Connect

Image

Image

Related posts

Leave a Comment